CCI CB Long .22 Long Lead Round Nose

Original price was: $239.99.Current price is: $173.70.

77 in stock

SKU: OEOJY725077 Category:

Product Overview

CCI Specialty CB Long .22 Long Rifle Rimfire ammunition is built around a clean-burning propellant and an accurate, lead round nose design for consistent performance on pests at longer rimfire distances and for everyday plinking.

Key Features

  • Clean-burning load helps keep your firearm action cleaner
  • 100-round plastic box with dispenser lid for convenient storage and handling
  • Lead round nose projectile designed for practical accuracy at longer ranges
  • Sure-fire CCI priming for reliable rimfire ignition

Choose CCI Specialty CB Long for accurate rimfire shooting with a cleaner-burning profile in the field or at the range.